⚙ jspolymers.com
EN · DE · ES · JA · PT · FR · IT · RU · AR
✉ claire@jsltupe.com · 📞 +86 189 6300 3803
📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · FOB Qingdao
HomeBlogHow to Install UHMWPE Rink Board Edge Cap Trim
How-to Guide · JS Polymers

How to Install UHMWPE Rink Board Edge Cap Trim

Practical step-by-step guide based on field experience. Send your DWG and we quote within 24 hours.

Overview

This guide covers the practical steps to install uhmwpe rink board edge cap trim. JS Polymers produces engineering plastic components in UHMWPE, HDPE, PA, POM and PTFE — full-process fabrication from raw sheet to CNC-machined parts.

Step-by-step procedure

  1. Measure rink perimeter. Add cap length around all sides plus corners.
  2. Mark fastening points. Bolt at 600mm spacing into subfloor.
  3. Drill panel and subfloor. Pilot drill through cap and panel into subfloor.
  4. Mechanical fastening. Use stainless screws with washer; flush-mount heads.
  5. Verify no panel lift. Apply downward force; verify T&G stays engaged.

Need help?

Our engineering team reviews drawings within 24 hours. We have shipped to 80+ countries across 4 continents and hold ISO 9001 certification.

Get a Quote in 24 Hours

Send your DWG/DXF/PDF/STEP files to claire@jsltupe.com — we reply within 24 h with unit cost, lead time, and FOB Qingdao shipping option.

📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · Quote on request

Contact Us

© Dezhou Jiasheng Rubber & Plastic Products · ISO 9001 · 80+ countries
FOB Qingdao · MOQ from 1 piece · Quote in 24h · claire@jsltupe.com